Size reduction
Stages 1–7- 1
Crusher
Reduces run-of-mine rock to a feed the mill can take. Jaw crusher, 16 in × 9 in.
- 4
Descendicator
Beater-type disintegrator. Required to bring 30/80 mesh grains to mill feed size.
- 7
Ball Mill
14 ft × 6 ft air-swept ball mill. The grinding stage — everything before it prepares the feed, everything after it separates the product.
Classification
Stages 8–10- 8
Classifier
1000 mm high-efficiency dynamic classifier. Cage speed sets the cut point, and so the fineness.
- 9
Coarse return
Oversize from the classifier goes straight back to the mill inlet. This is what makes it a closed circuit.
- 10
Fine material
Product-size particles travel on in the air stream to the collection stage.
Collection
Stages 11–13- 11
RPJ Bag Filter
Reverse pulse jet filter, cleaned on line, collects the product out of the air.
- 12
Rotary Airlock
300 mm valve discharges the collected powder while holding the pressure difference.
- 13
Blower
400 CFM centrifugal blower draws the air through the whole circuit.
Coating line — optional
Stages 14–21- 14
Elevator-3
Coating line begins. Lifts finished powder to the coating feed hopper.
- 15
Hopper-3
Feed hopper for the coating line.
- 16
Screw Conveyor-1
6 in screw feeder meters powder into the mixer.
- 17
Mixer
Powder and molten stearic acid are brought together.
- 18
Screw Conveyor-2
Carries the treated powder on to the pulveriser.
- 19
Pulveriser
Breaks any agglomerates formed during coating.
- 20
Elevator-4
Lifts coated product to final storage.
- 21
Hopper-4
Finished coated product, ready for packing.
Seen as a machine
The same twenty-one stages, built.
Every stage in the chart above is a real machine bolted to a real floor. This is the line as it stands, drawn from the company's CAD assembly.
What the site has to provide
Before the erection team arrives.
Space and civil work
A bay of 40 ft long × 20 ft wide × 30 ft high per micronizer plant. The mill foundation is poured by the customer to a dimensioned drawing AEW supplies; the foundation frame is collected from the AEW workshop.
During erection
Roughly seven days on site. The customer provides a 12–14 tonne crane for three of them, plus oxygen, an LPG cylinder and a welding machine, and food and accommodation for the team. Panel, cables and accessories are bought separately.